Projects

Numbers Speak

For over a decade Boston has completed over hundred trunkey projects on different modalities across the country

MRI Projects
+
CT-Scan Projects
+
The Countries Cath-Lab Bases
%
Equipment Installations
K+

Critical Infrastructure

We install and commission systems that ensure safety and continuity. A hospital cannot function without reliable utility infrastructure.
This covers every discipline required for the creation of a complete hospital room.
Advanced Modular OR and centralized control of equipment
Oxygen Plant Manufacturing Set-up
MRI and CT Scan Installation
Advanced Pathology Equipment installation
Full Surgical Solution Set-up

  • Selale University General Specialized Hospital

Fully Operational Nuclear Medicine SPECT_CT Installation

  • Pioneer Diagnostic Center /Arsho Branch

Fully Operational Dialysis and water treatment set-up

  • Negele Arsi General Hospital and Medical College

Some of our Works

img 5429
20250622 111540

Selale University Comprehensive Specialized Hospital

20250614 200011
iugfdxcvb
Successful project completion of our modular operating theater and oxygen plant

State-of-the-art facility marks a bold leap forward for the Oromia region and Ethiopia as a whole, delivering advanced infrastructure and cutting-edge medical systems to ensure accessible, high-quality care for generations to come

ICMC Hospital Cath-lab Installation

we have successfully installed the cutting-edge GE Allia Cath Lab system at ICMC Hospital, marking another significant achievement. This installation signifies a remarkable enhancement in interventional cardiology, radiology, and neurology in our country. 

photo 2025 04 24 13 04 59
photo 2025 04 24 13 05 00

Harmaya University-Hiwot Fana Hospital MRI Project

MRI Installation ​

Trust and Worth

Our Clients